I’m back from the US and despite looking at the photos from afar, seeing it in person makes it all very real how much things have changed in 2 weeks!
Another week of digging and ground work, with all footings dug out and the first part of concrete poured in. Now up to 16 trucks of rubble taken away, with likely another 4 or 5 to go. Next week we might see the first block work going up, but that will be weather dependent. There will likely be no breakthrough into the house prior to Christmas.
Tried to do a low flight through the footings, didn’t quite achieve that!
As its a fairly boring drone shot this week, here’s a bonus clip of where the steps up will go. 3 metres wide, to be dug into the earth leading up to the garden.