Week 34 – The arch has gone!

Whilst Clare was sunning herself in Ibiza at the beginning of the week, the work continued here. Lots more painting & decorating, but also a lot of work on the halls and stairs – including hopefully the very last of the building destruction and installation of a final steel beam to replace the old arch in the hall.

Quite a few bits going on in general:

  • Bulk head work completed and extractor installed – still needs to be painted and LED lights fitted to the built in track
  • Walls and ceiling in hall white washed and first coats applied
  • Two more new windows added upstairs, the small en-suite and main window in bedroom 3. Further window work will now be completed once scaffolding is erected next week
  • Stair balustrades removed, to be replaced with new straight ones later
  • Cupboard at top of stairs removed
  • Stairway angle adjusted to enable previous joists to be removed and flatten the area where the old cupboard was
  • Hallway arch removed and wall taken out to create a more open hallway
  • Steel fitted and boxed in to replace the previous arch support
  • Downstairs toilet boxing woodwork completed, and room painted with an initial white coat
  • Office / snug woodwork and ceiling painted
  • Shelving unit built in office / snug and fitted into area to create the media shelving
  • Initial frames built for new upstairs windows to enable make good of plastering and fitting of wooden frame and trims
  • En-suite and dressing room further painted, including finishing the ceilings
  • En-suite floors covered with plywood to prepare for tiling